LOG HOME MANUFACTURING |
|
|||||||||||||||||||
![]() |
STAGE I
It takes years of experience to master the art of building a log home. Each log is hand-scribed, following the natural contour of the log, to fit the log below. We use a modified full scribe method, sometimes referred to as the Scandinavian method. After scribing the log, the scribed lines are cut out with a chainsaw, and detailed with chisel to form a lateral groove on the bottom of the log. During the re-assembly process insulation is installed into the lateral groove and notch of each log. An expandable foam gasket (Emseal) is also installed at this time.
![]() |
|
|||||||||||||||||||
![]() |
|||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
|
|||||||||||||||||||||
|
|
|
|
|
||||||||||||||||||